The Al Amiri hospital located in Sharq, Kuwait City had undergone a phase of expansion in 2014 covering a total area of 90,000sq. mts. The hospital now has 4 underground floors and 13 upper floors being connected to the old hospital via a tunnel and suspended footbridge. During the build, Akatherm’s HDPE specialist drainage solution was used to ensure a durable and flexible system.

Project Type 

Healthcare

Products

Akatherm HDPE drainage

Consultant

KEO International Kuwait

Contractor

Bader Al Mulla & Brothers Company